 |
Wireless cyber source dynamic configuration system ( carrier ) solution case
Hunan Changsha Changsha Changsha He Long stadium He Long stadium is located in the new century sports and cultural center of the northwest, the main project for layer 8 frame ( local 9 ), construction area of 117586 square meters, is the National Stadium of three, can accommodate 60000 spectators. The coverage of construction in Changsha City Room 9 new sectors, a total of about 50 carrier, the original station do outdoor cover. Using 9 sets of BSD-2900 system, the stadium whole divided into 3 major regions and a set of indoor coverage during the event, fully absorb the stadium traffic.
|