solution

Dynamic Configuration system
     With the continuous development of society, sudden increase of traffic hot spots, local area traffic and unexpected uneven traffic area of the base prevalence, low equipment utilization, and network planning with the previous existence of a serious conflict . However, operators are now also faced with the network expansion pressure and compression capital investment dilemma. Dynamic resource allocation using a wireless network system to solve the above problems, the solution can not increase the carrier's base station equipment and the case.

Wireless cyber source dynamic configuration system ( carrier ) solution case

Hunan Changsha Changsha Changsha He Long stadium He Long stadium is located in the new century sports and cultural center of the northwest, the main project for layer 8 frame ( local 9 ), construction area of 117586 square meters, is the National Stadium of three, can accommodate 60000 spectators. The coverage of construction in Changsha City Room 9 new sectors, a total of about 50 carrier, the original station do outdoor cover. Using 9 sets of BSD-2900 system, the stadium whole divided into 3 major regions and a set of indoor coverage during the event, fully absorb the stadium traffic.